Check whether there are termites in the environment: carefully observe whether there are termites around the room and furniture, floor inspection must be done before the termites and preventive engineering,
or the entire floor, or even all the wood products in the house have been seriously endangered.
Avoid cross-mixing operations: Wood flooring pavement should be hidden in the ground engineering, ceiling engineering, wall works, hydropower projects completed and acceptance of the cross-operation is likely to cause damage to the floor, such as the wall works are not completed, the gravel drop will result Take the ash,
scratch the floor and other issues, paint, paint spilled on the floor damage to the floor aesthetics and so on, we need to pay attention.
Is there a good waterproofing measures: afraid of water invasion of wood flooring, water invasion after the floor will be foaming, degumming, deformation and other issues,
resulting in unusable. Therefore, before the pavement to be checked waterproofing is done, the house is leaking, if any should be processed before laying the floor.
Hidden Engineering Consultation and Labeling: The owner should indicate the position of the concealed work in the room and make a striking mark to avoid damage to the buried pipes,
gas pipes, power lines and communication lines during construction.